Aerospace - Civil Aviation & AS9100 Case Study

Aerospace – Civil Aviation (AS9100 Traceability Playbook)

Key Standard:

  • AS9100 (Revision D, 2016) — A QMS standard for aviation, space, and defense that includes additional requirements beyond ISO 9001, especially in traceability, configuration control, and product safety. (Wikipedia)

Documented Insight:

  • Unexpected audit failure sources: A traceability-focused checklist for aerospace traceability shows that “traceability failures cost millions—from failed audits to scrapped materials and production stoppages.” It asserts that if traceability systems aren’t robust, companies risk non-compliance with AS9100, FAA, ITAR, and DoD requirements. (Manufacturo)
  • Why traceability is critical: A recent article on achieving AS9100 Rev D compliance emphasizes traceability of parts, materials, and components through their lifecycle as fundamental to safety, recall management, and regulatory compliance. (QMII, Oct 2024)
  • Audit-level expectations: Best-practice internal audit guidance makes it clear AS9100 audits will “verify traceability,” implying that failure in the traceability chain is a common audit non-conformity. (AssetPulse blog)

Typical Challenge:

  • Siloed data and manual tracking: Aerospace teams often use spreadsheet-based or physical tracking for serial numbers, lot origins, or configuration status, making it labor-intensive to trace a part from production to delivery. When this data is decentralized or incomplete, audits highlight the failure—as fastener mislabeling, untraceable batches, or poor supplier records.

Best Practice Playbook:

  1. Implement a central, digital traceability system
    • Deploy a QMS-integrated tool that can log every part, batch, or material with serial/lot number, supplier, and related certificates. Automate real-time tracking and reporting for audit readiness. (QMII, Manufacturo)
  2. Define your traceability depth upfront
    • Per AS9100 Rev D, clarity about whether traceability is needed at batch or serial level—and for which components—frames how systems are designed. (QMII)
  3. Build visible audit readiness dashboards
    • Use real-time traceability dashboards linked to AS9100, FAA, ITAR, or DoD requirements. This mitigates risk and helps teams preempt audit issues easily. (Manufacturo)
  4. Conduct regular internal traceability audits
    • Internal auditors should test traceability for random parts (P/N, SN, certification) end-to-end. Any divergence indicates risk before the 3rd-party audit. (AssetPulse)
  5. Train across the supply chain
    • Make traceability expectations explicit in supplier agreements. Ensure suppliers understand delivery trace needs—from fabrication to assembly completion.

References:

Benzer Gönderiler