Electronics / ICT - Telecoms & 5G Case Study

Electronics / ICT (Telecoms, 5G, Networking)

Key standards

  • IEC 61850 (communication networks and systems in substations), IEEE 1588 (PTP time synchronisation), 3GPP/ETSI (5G).

Documented issues

PAC World reported results from multi-vendor interoperability tests for IEC 61850. They found that some Intelligent Electronic Devices (IEDs) lost PTP time synchronisation, which blocked protection functions during tests. The report emphasises that multi-vendor functional testing is essential and that issues require triage. pacw.org.

Typical challenges

  • Integrating devices from multiple vendors can lead to interoperability and time-sync problems.
  • Engineers rely on default configurations and assume devices conform fully to the standard.
  • Lack of central management for firmware updates and configuration files.

Best Practice playbook

  1. Plan and conduct multi-vendor interoperability tests early in projects; verify GOOSE and Sampled Value messaging across all IEDs. pacw.org.
  2. Ensure reliable time synchronization (IEEE 1588/PTP) across devices; monitor for sync loss and configure fallback states.
  3. Manage firmware and configuration files centrally; avoid mismatched versions.
  4. Use conformance certificates and test reports from independent labs; update procurement specifications to require them.
  5. Provide training on IEC 61850 engineering and commissioning; involve vendor experts.

References

  • PAC World article detailing IEC 61850 interoperability test findings (IED time-sync loss and blocked protection functions). pacw.org.