IEC 60965:2016 PDF | Request Standard
Latest

IEC 60965:2016

Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room

Standard by IEC, 2016-02-23

Available Formats:

  • Availability: Immediate Download
  • Language: English
  • License Type: Single User
  • Updates: Not Included
  • Availability: Request Quote
  • Language: English
  • License Type: Enterprise / Multi User
  • Updates: Included

About This Item

Legal Notices*

IEC 60965:2016 defines technical guidance for a supplementary control room used to shut down a reactor when the main control room is not accessible. For organizations involved in nuclear plant engineering, safety documentation, or procurement review, IEC 60965:2016 is relevant because it helps frame how an alternate operating location should support safe shutdown and control functions under abnormal conditions. The document is a practical compliance reference for technical assessment, verification activities, and documented evaluation.

What is IEC 60965:2016?

IEC 60965:2016 addresses the supplementary control room concept for nuclear power plants, with emphasis on maintaining reactor shutdown capability when the primary control room cannot be used. Its scope is generally associated with human factors, control system readiness, operational consistency, and the reliability of supporting functions needed during upset or emergency conditions. For engineering teams and conformity assessment workflows, it serves as a focused technical document for reviewing design intent, functional adequacy, and compliance-related expectations.

Applications of IEC 60965:2016

This document is commonly used in nuclear safety engineering, plant modernization projects, control room design reviews, and procurement specifications for shutdown-related control infrastructure. It may support technical validation of alternate operator workspaces, review of control and monitoring arrangements, and laboratory or system-level evaluation of functions intended for emergency use. IEC 60965:2016 is also relevant in compliance workflows where teams must document how the supplementary control room supports operational continuity and regulatory preparation.

Why is IEC 60965:2016 important?

In nuclear power applications, the ability to place and keep a reactor in a safe shutdown state is a critical risk-management concern. IEC 60965:2016 helps organizations structure engineering review around that need by supporting clearer expectations for safety, interface consistency, and technical validation. It can also improve procurement alignment and quality assurance by giving buyers, designers, and assessors a common reference when evaluating supplementary control room capability, testing consistency, and conformity assessment readiness.

  • Supports evaluation of supplementary control room functions for reactor shutdown situations
  • Helps align engineering documentation with safety and compliance expectations
  • Useful for procurement, design review, and verification planning in nuclear projects
  • Provides a technical basis for assessing operational readiness under main control room unavailability
SKU: 3353daee6edf

  • Publication Date: 2016-02-23
  • Standard Status: Original
  • Publisher: IEC
  • Edition: 3

Please request information about the document. Contact Page

Online Standart App

Need This Standard?

Need This Standard?

Summarize with AI

ChatGPT Perplexity Google AI Claude Grok

Online Standart Disclaimer

OnlineStandart.com is an authorized reseller of international standards, operating through partnerships with authorized distributors. We do not own the copyrights or trademarks of the standards we sell, including but not limited to those of API, ASHRAE, BSI, SAE, ASTM, IEEE, IEC, ASME, ISO, and others.

All product names, logos, and brands are the property of their respective owners and are used for identification purposes only; their use does not imply endorsement. OnlineStandart.com is not affiliated with or endorsed by any standards development organization unless explicitly stated. The content of this document is for informational purposes only and is intended to promote our licensed reselling services.

Online Standart does not host, distribute, or link to free, unlicensed, or uncertified copies of copyrighted standards. Every document we deliver is a licensed copy obtained through authorized channels and supplied with full licensing documentation. The “Free PDF Download” option on our product pages refers to this free informational document — never to a free copy of any standard.