IEEE P1267/D4, May 2018
IEEE Approved Draft Guide for Development of Specification for Turnkey Substation Projects
Available Formats:
- Availability: Immediate Download
- Language: English
- License Type: Single User
- Updates: Not Included
- Availability: Request Quote
- Language: English
- License Type: Enterprise / Multi User
- Updates: Included
About This Item
IEEE P1267/D4, May 2018 is an approved draft guide for developing a specification for turnkey substation projects. It is aimed at helping teams define requirements for electrical power infrastructure where components, circuits, devices, and systems must be coordinated into one deliverable package. For utilities, engineers, and procurement teams, this standard can support clearer project definition, better vendor alignment, and more consistent decision-making during planning, design, and acceptance activities.
IEEE P1267/D4, May 2018 overview
IEEE P1267/D4, May 2018 provides guidance for building a specification framework around a turnkey substation project. In practice, that means it can help organize technical expectations for equipment integration, performance criteria, interfaces, and project responsibilities within a substation environment. Because the document is a draft guide, it is most useful as a reference for structuring requirements and reducing ambiguity before final procurement or implementation steps. Its focus supports more disciplined specification development for power and energy applications.
Typical use cases
This guide is commonly relevant when preparing specifications for new or upgraded substations that are to be delivered as turnkey projects. It may be used during owner requirements development, bid package preparation, or contractor scope definition for station equipment, control systems, and associated electrical assemblies. The standard is also useful when multiple stakeholders need a shared basis for documenting system boundaries, technical interfaces, and acceptance expectations across a project involving power distribution or transmission infrastructure.
Why this standard matters
Clear specification writing is important in turnkey substation work because incomplete or inconsistent requirements can lead to scope gaps, procurement disputes, and integration problems. IEEE P1267/D4, May 2018 can help improve consistency in design control and reduce risk by giving project teams a more structured way to describe technical needs. That is especially valuable when coordinating components, circuits, and devices into one functional system and when testing or acceptance must confirm that the delivered substation meets the intended performance.
- Turnkey substation specification guidance
- Requirements for integrated electrical systems
- Project scope and interface definition
- Support for procurement and acceptance planning
- Applicable to power, energy, and industrial applications
- Publication Date: 2018
- Standard Status: Inactive
- Publisher: IEEE
- Subject: Components, Circuits, Devices and Systems; Power, Energy and Industry Applications
- Official IEEE: Doi link
Please request information about the document. Contact Page
Need This Standard?
Request a personalized quote today to receive the latest edition in PDF or other available formats.
Need This Standard?
Request a personalized quote today to receive the latest edition in PDF or other available formats.
Summarize with AI
Get quick summaries using your favorite AI engine.
Online Standart Disclaimer
OnlineStandart.com is an authorized reseller of international standards, operating through partnerships with authorized distributors. We do not own the copyrights or trademarks of the standards we sell, including but not limited to those of API, ASHRAE, BSI, SAE, ASTM, IEEE, IEC, ASME, ISO, and others.
All product names, logos, and brands are the property of their respective owners and are used for identification purposes only; their use does not imply endorsement. OnlineStandart.com is not affiliated with or endorsed by any standards development organization unless explicitly stated. The content of this document is for informational purposes only and is intended to promote our licensed reselling services.
Online Standart does not host, distribute, or link to free, unlicensed, or uncertified copies of copyrighted standards. Every document we deliver is a licensed copy obtained through authorized channels and supplied with full licensing documentation. The “Free PDF Download” option on our product pages refers to this free informational document — never to a free copy of any standard.




