IEEE IEEE P1248/D12, Feb 2019 PDF | Request Standard
Historical

IEEE IEEE P1248/D12, Feb 2019

IEEE Draft Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants

Standard by IEEE, 2019

Available Formats:

  • Availability: Immediate Download
  • Language: English
  • License Type: Single User
  • Updates: Not Included
  • Availability: Request Quote
  • Language: English
  • License Type: Enterprise / Multi User
  • Updates: Included

About This Item

Legal Notices*

IEEE P1248/D12, Feb 2019 is an IEEE draft guide focused on commissioning electrical systems in hydroelectric power plants. It addresses the practical steps needed to verify that installed equipment, controls, and interconnections are ready for service in a demanding generation environment. For owners, engineers, and test teams, this technical document helps bring structure to startup activities and supports safer, more consistent handover of complex power systems.

Overview of IEEE P1248/D12, Feb 2019

This draft guide is centered on commissioning practices for hydroelectric plant electrical systems, where power equipment, circuits, and related devices must work reliably under operational and environmental stresses. IEEE P1248/D12, Feb 2019 is intended to guide checks, testing, and acceptance activities that confirm system readiness before energization. Its scope is especially relevant where electrical infrastructure interfaces with generation assets, protection schemes, and plant control functions, making disciplined commissioning a key part of project completion.

Typical use cases

IEEE P1248/D12, Feb 2019 is commonly used during new construction, refurbishment, or major outage work at hydroelectric facilities. It may support commissioning plans for generators, switchgear, protective relays, cables, grounding systems, and plant control circuits. The guide is also useful for coordinating field testing, verifying wiring and functional performance, and confirming that electrical subsystems operate correctly before commercial service. In practice, it helps teams align startup work across engineering, construction, and operations groups.

Why it matters

Commissioning is where design intent meets real equipment behavior, so a clear guide can reduce errors and delay risk. IEEE P1248/D12, Feb 2019 helps promote consistency in testing, documentation, and acceptance decisions for hydroelectric electrical systems. That matters for safety, system reliability, and procurement confidence, especially when multiple contractors or disciplines are involved. Using a defined commissioning approach can also support better defect detection before energization and improve long-term performance expectations.

  • Hydroelectric plant electrical commissioning
  • Pre-energization checks and acceptance testing
  • Protection, control, and power circuit verification
  • Startup coordination for new or upgraded installations
SKU: dfc83adc278a

  • Publication Date: 2019
  • Standard Status: Inactive
  • Publisher: IEEE
  • Subject: Components, Circuits, Devices and Systems; Fields, Waves and Electromagnetics; Geoscience; Power, Energy and Industry Applications
  • Official IEEE: Doi link
  • New Version Available: IEEE (2025)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2022)
  • Previous Version: IEEE (2022)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2019)
  • This Version: IEEE (2019)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2015)
  • Previous Version: IEEE (2011)
  • Previous Version: IEEE (2010)
  • Previous Version: IEEE (2007)
  • Previous Version: IEEE (2003)

Please request information about the document. Contact Page

Online Standart App

Need This Standard?

Need This Standard?

Summarize with AI

ChatGPT Perplexity Google AI Claude Grok

Online Standart Disclaimer

OnlineStandart.com is an authorized reseller of international standards, operating through partnerships with authorized distributors. We do not own the copyrights or trademarks of the standards we sell, including but not limited to those of API, ASHRAE, BSI, SAE, ASTM, IEEE, IEC, ASME, ISO, and others.

All product names, logos, and brands are the property of their respective owners and are used for identification purposes only; their use does not imply endorsement. OnlineStandart.com is not affiliated with or endorsed by any standards development organization unless explicitly stated. The content of this document is for informational purposes only and is intended to promote our licensed reselling services.

Online Standart does not host, distribute, or link to free, unlicensed, or uncertified copies of copyrighted standards. Every document we deliver is a licensed copy obtained through authorized channels and supplied with full licensing documentation. The “Free PDF Download” option on our product pages refers to this free informational document — never to a free copy of any standard.