IEEE IEEE P1267/D02, May 2017 PDF | Request Standard
Historical

IEEE IEEE P1267/D02, May 2017

IEEE Draft Guide for Development of Specification for Turnkey Substation Projects

Standard by IEEE, 2017

Available Formats:

  • Availability: Immediate Download
  • Language: English
  • License Type: Single User
  • Updates: Not Included
  • Availability: Request Quote
  • Language: English
  • License Type: Enterprise / Multi User
  • Updates: Included

About This Item

Legal Notices*

IEEE P1267/D02, May 2017 is a draft guide for developing a specification for turnkey substation projects. It is aimed at helping define requirements for integrated substation delivery, where components, circuits, devices, and system interfaces must work together reliably. For power, energy, and industrial applications, the document can support clearer procurement language, better design coordination, and more consistent project expectations across engineering and construction activities.

IEEE P1267/D02, May 2017 overview

This draft guide focuses on how to structure a specification for a turnkey substation project, with attention to the technical details that commonly affect performance, integration, and acceptance. IEEE P1267/D02, May 2017 is relevant when a project needs a clear basis for defining scope, equipment responsibilities, and system-level requirements. By framing the specification process, it can help align owner expectations with engineering deliverables and reduce ambiguity during project execution.

Typical use cases

IEEE P1267/D02, May 2017 may be used when preparing specifications for new substation builds, major upgrades, or packaged delivery contracts involving primary and secondary electrical systems. It is especially useful where switchgear, control equipment, protection functions, and related interfaces must be coordinated under a single project scope. Teams working on utility, industrial, or energy infrastructure projects can use it to shape technical requirements for turnkey procurement, review, and acceptance planning.

Why this standard matters

Turnkey substation projects depend on precise specification writing to avoid gaps between design intent, vendor supply, and field implementation. IEEE P1267/D02, May 2017 can help improve consistency in requirements, support safer system integration, and reduce the risk of omissions during procurement or testing. A more structured specification process also makes it easier to compare bids, confirm compliance, and manage performance expectations for interconnected electrical equipment and control systems.

  • Turnkey substation specification guidance
  • Project scope and interface definition
  • Electrical equipment and control coordination
  • Procurement and acceptance planning
SKU: af643d990f9c

  • Publication Date: 2017
  • Standard Status: Inactive
  • Publisher: IEEE
  • Subject: Components, Circuits, Devices and Systems; Power, Energy and Industry Applications
  • Official IEEE: Doi link
  • New Version Available: IEEE (2025)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2023)
  • Previous Version: IEEE (2022)
  • Previous Version: IEEE (2022)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2021)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2020)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2019)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2018)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • This Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2017)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2016)
  • Previous Version: IEEE (2015)
  • Previous Version: IEEE (2011)
  • Previous Version: IEEE (2010)
  • Previous Version: IEEE (2007)
  • Previous Version: IEEE (2003)

Please request information about the document. Contact Page

Online Standart App

Need This Standard?

Need This Standard?

Summarize with AI

ChatGPT Perplexity Google AI Claude Grok

Online Standart Disclaimer

OnlineStandart.com is an authorized reseller of international standards, operating through partnerships with authorized distributors. We do not own the copyrights or trademarks of the standards we sell, including but not limited to those of API, ASHRAE, BSI, SAE, ASTM, IEEE, IEC, ASME, ISO, and others.

All product names, logos, and brands are the property of their respective owners and are used for identification purposes only; their use does not imply endorsement. OnlineStandart.com is not affiliated with or endorsed by any standards development organization unless explicitly stated. The content of this document is for informational purposes only and is intended to promote our licensed reselling services.

Online Standart does not host, distribute, or link to free, unlicensed, or uncertified copies of copyrighted standards. Every document we deliver is a licensed copy obtained through authorized channels and supplied with full licensing documentation. The “Free PDF Download” option on our product pages refers to this free informational document — never to a free copy of any standard.